PROJECT: Drywall upper area in front room of Ant Hall

The Mission: The front room of the Ant Hall is a big problem for sound bleed. The upper area (currently the back of the equipment storage area) needs to be drywalled and studded to block sound for the rest of the hall. The wall area will need to be framed with 2×4s and have drywall applied. The area is approx 9ft in the air and will need ladder use to help facilitate the construction. The wall can also be reached from the equipment storage. There is currently some wood in that area that doesn’t seem to be doing much.

This project is just for the initial construction and does not include painting, sanding, or mudding.

PROJECT DETAILS

Skills Required:

  • Heavy lifting

  • Measurement

  • Simple construction

Tool Use Needed:

  • Screw gun

  • Saw

Cost/Materials Needed:

  • 3 4×8 drywall sheets ~$50

  • screws and tape ~$30

  • 6 studs ~$50

💵ESTIMATED PROJECT COST - $130💵


PROJECT KEY:🟠NEEDS RESOURCE | 🟢READY TO GO | 🔵COMPLETE


PROJECT NEEDS

🟠 VOLUNTEERS | 2 General Labor Volunteers | ⏱️ 3 Hours | Payout: 💰 45 Ant Bucks

🟠 FUNDING | 💵TOTAL PROJECT COST - $130💵

🟠 SCHEDULING | No Date Scheduled Yet

Note: Most projects are scheduled for weekends during daytime hours. If you have limited hours or a different availability please jump into our Discord.